Surface by surface
- Wood clapboard and fiber-cement siding
- Washed as prep, loose paint scraped, edges sanded, joints caulked and bare spots primed.
- Previously painted vinyl or aluminium siding
- Checked at the estimate visit before anything is agreed.
- Trim, fascia and soffits
- Often the most weathered parts of the house, so they usually need the most scraping and caulking.
- Doors and shutters
- Hardware is masked or removed, and surfaces are sanded so the new coat grips.
- Porches, railings and steps
- Prepared and painted in a planned order so you can still get in and out.
- Brick, stone and stucco
- Masonry coatings are not in our scope.
Condition cues
Peeling, chalky paint and cracked caulk all tell us what prep a surface needs. The condition guide explains each one.
Weather, seasons and scheduling
Exterior paint needs dry surfaces and temperatures within the range on the product label. Rain, heavy dew and cold nights all count, so the painting season matters.
Your dates are set at the scheduling step and may move. If the weather turns, we talk to you and agree a new date.
Protecting landscaping and property
Plants and beds next to the house are covered, outdoor fixtures and hardware are masked, and ladders are placed with care around paths and planting. Rotten wood is flagged for a carpenter.
Older home? Read the note on older paint.

Exterior questions
Do you pressure wash the house first?
Washing is done only as paint prep, as part of an exterior job. Standalone pressure washing is not in our scope.
Will you paint the brick chimney?
No. Brick, stone and stucco masonry coatings are not in our scope.
Do you need water and power?
Yes. Access to an outdoor tap and a power outlet helps. We confirm this at the visit.
Can you do just the porch?
Yes. Porches, railings and steps can be a job on their own.